The first step in our preparation for ISO 9001 compliance was the arduous process of documenting all of the essential procedures used within our business. That was only the beginning! After everything had been documented, we began an implementation phase which put our documented procedures to the test.
Step 1 during implementation was to provide … even more documentation:
Next we developed a Quality System Development (QSD) checklist, which identified implementation activities required to complete our system and serve as a guide in verification activities. After this, we began to implement the processes and functions required by ISO 9001, based on our QSD checklist.
One of the most fundamental parts of demonstrating compliance with the ISO 9001:2008 standard is record keeping. In terms of our final audit: if there’s no record, the assumption is that the event never happened. It became critical during the implementation phase to begin generating and collecting various quality-related records in order to ensure there was sufficient evidence to demonstrate the ability of our QMS to achieve desired outcomes.
It also became necessary to establish a local filing area and system to maintain historical data for personnel, equipment, materials, and other items related to our QMS. The generation, collection, and control of our quality records will be an ongoing activity throughout the life of our QMS.
There were some implementation activities that required a longer period to complete. This was primarily due to dependencies that existed between activities or the need to perform an activity in a specific sequence. Some of the activities that occurred during the later stages of implementation were:
At this point, we were all seeing the results of our commitment and feeling very close to our goal!